For the client, the Municipality of Vipava, we have prepared the project documentation for the construction of a new road bridge over the Močilnik River, including the arrangement of the riverbed and connections to the existing road network. The new bridge is located next to a protected stone bridge, which is no longer suitable for today's traffic due to geometric limitations. The old bridge is intended for pedestrians and cyclists.